Fukushima: They Knew

March 13th, 2021 - by Greg Palast / Greg Palast's Website

Fukushima: They Knew

Greg Palast / Greg Palast’s Website

(March 12, 2021) — Today is the 10th anniversary of the Fukushima tsunami and meltdown.

A nuclear plant is built with steel and cement and lies and fraud — and that’s the take-a-way for today.

Stacey Abrams has shown REAL courage in Georgia in her opposition to the Vogtle nuclear power plant — the last and only nuclear plant under construction in the USA. As the building trades are behind this multi-billion dollar project, alongside thousands of small Georgia suppliers, this has cost her. But she won’t back charging Georgians ruinous electric bills to finish it.

(The only other plant under construction was South Texas — a plant stopped when its builder, Tokyo Electric Power, pulled the plug in 2011 after its Fukushima plant went down. They were chosen because they had, supposedly, the world’s best safety record.)

As the federal and state lead investigator in the nuclear industry racketeering case Suffolk v. LILCO, I dug into the Fukushima meltdown. They were required to harden the plant against an earthquake the size that hit on March 11 — but never did. And the back-up generators were NEVER flooded — their shafts snapped, as happened again and again in emergencies in the US.

This is part of my chapter from Vultures’ Picnic on Fukushima, if you’re curious about such stuff.

“Completely and Utterly Fail in an Earthquake”: The Fukushima story you didn’t hear on CNN

I’ve seen a lot of sick stuff in my career, but this was sick on a new level. Here was the handwritten log kept by a senior engineer at the nuclear power plant:

Wiesel was very upset. He seemed very nervous. Very agitated. . . . In fact, the plant was riddled with problems that, no way on earth, could stand an earthquake. The team of engineers sent in to inspect found that most of these components could “completely and utterly fail” during an earthquake.

“Utterly fail during an earthquake.” And here in Japan was the quake and here is the utter failure.

The warning was in what the investigations team called The Notebook, which I’m not supposed to have. Good thing I’ve kept a copy anyway, because the file cabinets went down with my office building ….

WORLD TRADE CENTER TOWER 1, FIFTY-SECOND FLOOR, NEW YORK, 1986

Two senior nuclear plant engineers were spilling out their souls and files on our huge conference table, blowing away my government investigations team with the inside stuff about the construction of the Shoreham, New York, power station.

The meeting was secret. Very secret. Their courage could destroy their careers: No engineering firm wants to hire a snitch, even one who has saved thousands of lives. They could lose their jobs; they could lose everything. They did. That’s what happens. Have a nice day.

On March 12, 2011, as I watched Fukushima melt, I knew: the “SQ” had been faked. Anderson Cooper said it would all be OK. He’d flown to Japan, to suck up the radiation and official company bullshit. The horror show was not the fault of Tokyo Electric, he said, because the plant was built to withstand only an 8.0 earthquake on the Richter scale, and this was 9.0.

Anderson must have been in the gym when they handed out the facts. The 9.0 shake was in the middle of the Pacific Ocean, 90 miles away. It was barely a tenth of that power at Fukushima.

I called the US Geological Survey. (Yes, Anderson, journalists are allowed to check out facts.) The plant took a hit of 550 galileos. (The “Richter scale” is TV talk — “galileos” measure ground movement at the danger point). I contacted my network of engineers. Turns out, Tokyo power promised government regulators they would raise seismic (earthquake) protection to 600 galileos. They promised. That was 2006, five years before the meltdown. So there you have it. If TEPCO had not played the regulators, Japan would not be suffering a slow-motion Hiroshima.

I was ready to vomit. Because I knew even more. I knew who had designed the plant, who had built it and whom Tokyo Electric Power was having rebuild it: Shaw Construction. Shaw Construction-the latest alias of Stone & Webster, the designated builder for every one of the four new nuclear plants that the Obama Administration has approved for billions in federal studies.

But I had The Notebook, the diaries of the earthquake inspector for the company. I’d squirreled it out sometime before the Trade Center went down. I shouldn’t have done that. Too bad.

All field engineers keep a diary. Gordon Dick, a supervisor, wasn’t supposed to show his to us. I asked him to show it to us and, reluctantly, he directed me to these notes about the “SQ” tests.

SQ is nuclear-speak for “Seismic Qualification.” A seismically qualified nuclear plant won’t melt down if you shake it. A “seismic event” can be an earthquake or a Christmas present from Al Qaeda. You can’t run a nuclear reactor in the USA or Europe or Japan without certified SQ.

This much is clear from his notebook: This nuclear plant will melt down in an earthquake. The plant dismally failed to meet the Seismic I (shaking) standards required by US and international rules.

Here’s what we learned: Dick’s subordinate at the nuclear plant, Robert Wiesel, conducted the standard seismic review. Wiesel flunked his company. No good. Dick then ordered Wiesel to change his report to the Nuclear Regulatory Commission, change it from failed to passed. Dick didn’t want to make Wiesel do it, but Dick was under the gun himself, acting on direct command from corporate chiefs. From The Notebook:

Wiesel was very upset. He seemed very nervous. Very agitated. [He said,] “I believe these are bad results and I believe it’s reportable,” and then he took the volume of federal regulations from the shelf and went to section 50.55(e), which describes reportable deficiencies at a nuclear plant and [they] read the section together, with Wiesel pointing to the appropriate paragraphs that federal law clearly required [them and the company] to report the Category II, Seismic I deficiencies.

Wiesel then expressed his concern that he was afraid that if he [Wiesel] reported the deficiencies, he would be fired, but that if he didn’t report the deficiencies, he would be breaking a federal law. . . .

The law is clear. It is a crime not to report a safety failure. I could imagine Wiesel standing there with that big, thick rule book in his hands, The Law. It must have been heavy. So was his paycheck. He weighed the choices: Break the law, possibly a jail-time crime, or keep his job.

What did Wiesel do? What would you do?

Why the hell would his company make this man walk the line? Why did they put the gun to his head, to make him conceal mortal danger? It was the money. It’s always the money. Fixing the seismic problem would have cost the plant’s owner half a billion dollars easy. A guy from corporate told Dick, “Bob is a good man. He’ll do what’s right. Don’t worry about Bob.”
That is, they thought Bob would save his job and career rather than rat out the company to the feds.

But I think we should all worry about Bob. The company he worked for, Stone & Webster Engineering, built or designed about a third of the nuclear plants in the United States.

From the fifty-second floor we could look at the Statue of Liberty. She didn’t look back.

Greg Palast was the lead investigator in the successful government racketeering case against nuclear plant builders which resulted in the closure of the Shoreham plant, NY.

Posted in accordance with Title 17, Section 107, US Code, for noncommercial, educational purposes.